August 29, 2021
So, you have decided to build your dream home from scratch? Congratulations! This is by no means an easy feat to achieve because it needs a lot of effort and investment. Moreover, things can get really stressful at times, especially when things do not go your way. That said, the eventual result is sure to be a permanent asset for you.
At this juncture, you may be wondering “what are the different stages of building a house?” You need not fret over this, because we are breaking down every single stage of home building from the commencement of construction to the precise moment you are handed over the keys. So, let’s get started.
1. Preparation of the site
The task of home construction commences with site preparation and clearing. If the need arises, earth levelling is carried out. After the site is levelled, clear, and ready, you along with the builder will successfully stake out a floor plan on site. Experiencing the floor plan in person is indeed a wonderful moment. Kudos to you!
2. Floor slab
The next stage in building a home is installing the primary concrete floor slab. The Foundation will be eventually dug, caged, and poured as per the specifications of your structural engineer. Moreover, plumbing will also be laid out in this phase. The next step is the pouring the main concrete floor.
3. Framing (walls and roof structures)
Next up is building your house’s main structure. This stage of home building is one of the most exhilarating ones. There exist different methods of home construction that use diverse raw materials: steel, concrete, brick, timber, among others. That said, the basic principle stays the same: you will witness the rising of your home walls from the slab. This first sight is sure to take your breath away.
4. Roofing
Post-construction of the walls as well as the roof structure, the roof will be meticulously installed with efficient waterproofing.
5. External finishes
Building home plans at this stage will be inefficient because exterior walls will be immaculately finished. Block, brick, and concrete external walls will be rendered and painted according to your bespoke preferences. Conversely, if your home has a light-framed structure such as steel or wood, cladding and insulation of the structure is essential with a material of your choice: wooden planks or GRP (Glass Reinforced Plastic) panels. In-depth research at this stage will pay off in the end.
6. Windows and doors
Now that the heavy site work is executed, you can breathe a sigh of relief! Next up is the installation of windows and external doors. This makes your house completely watertight and well protected. Internal sections of your house may now see some action in the form of plumbing, electrical work, and finishing.
7. Rough-ins
Plumbers and electricians will now install pipes and electrical cables, respectively. This stage of building home design is also called “roughing in” because they will not connect the pipes and cables to live sources, until later in the process of construction. So, you will have to wait with bated breath.
8. Internal finishes
Post-installation of pipes and cables, work will commence on the floor finishes, internal wall finishes, and non-structural internal walls. Some of the tasks that will be carried out include tiling, plastering, painting, and installation of finished floors.
9. Carpentry
At this stage, house construction carpenters will begin working on the installation of built-in furniture such as bedroom closets and kitchen cabinets. Ensure that you give free rein to your imagination at this point.
10. Fixtures, fittings, and equipment
Fixtures, Fittings, and Equipment (or FF&E) is the last significant stage of homebuilding. Your plumber will install faucets, sinks, water closets, showers, and several other wet systems. In addition, your electrician will install lights, switches, and power outlets, eventually making the system live. Lastly, you will receive delivery of large appliances such as refrigerators, washing machines, dishwashers, and air-conditioners.
11. Practical completion
At this stage of practical completion, you can rejoice because your home is essentially complete. You need to take a tour of the property and ensure that everything is built and properly completed as agreed in the contract.
12. Handover of the keys
This is a moment of pure bliss that you have been waiting for. It will surely seem like an extremely long time since the start of your home construction. After getting possession of the keys, your joy will surely know no boundaries.
The final word
Now you know what are the stages of building a house! Even though things may seem tedious and stressful at times, the result is worth the effort. After all, it’s your dream home! Finding the right experts and a dedicated team that can help you build your dream home can be tough but is essential, as they will guide you through all the steps. All the phases with such a team will be pre-planned and you need not expect any surprises in form of spiked budgets or blunders. If you are looking for such a team, you can contact JSW One Homes.
Ready to build your dream home? Schedule a free consultation to start your journey today!